We were awarded the works following a tender process.
The works were awarded on a D&B basis. We fully designed and carried out a CAT B fit out of the existing carbon neutral floor area. The works included forming breakout areas, new toilet areas, executive glazed offices, AC and heating adjustments, new small power, and full interior and furniture design including supply and installation.