Q3 Academy/Albany Spc Services Ltd

Q3 Academy - Tipton

We were awarded the works following a tender process. The existing building sited a 25m redundant swimming pool, our brief was to strip out all fixtures and fittings, including the existing ceramic tiles to the base and sides of the pool, we then filled the swimming pool with concrete, working closely with the project engineer. Following the infill we carried out a complete fit out which included, DPM to floor, latex and apply vinyl flooring with expansion joint details, install new suspended ceiling, lighting, power, fire alarm & new heating system, installing new aluminium doors into the existing curtain walling, and installing a DDA compliant access ramp.
Project Value
£ 0
Project Duration
0 Weeks

Connect

Get in Touch

We’re here to assist you with all your Construction, Fit Out & Dilapidation needs. Reach out today!

Email

info@davinte.co.uk

Phone

01384 881367

WhatsApp

07888871292

Where to Find Us

Room 5, The Granary, Central Buildings, High Street, Wombourne, WV5 9DN